Frequently Asked Questions

Everything you need to know about our enclosures, plug & play systems, and install options.

Yes. Every enclosure and package is designed around a specific year, make, model, and body style. Use the vehicle selector or “Shop by Truck” section and we’ll only show you options built for your exact platform.

Most of our systems are designed to fit cleanly under the rear seat with no seat lift required. If a specific setup requires a seat lift or any modification, we’ll clearly call it out on the product page before you order.

Stage 1 is the clean OEM+ option for customers who want a simple, high-quality bass upgrade. Stage 2 adds the premium show-style look with acrylic windows, LED lighting, and interior-matched upholstery. Stage 5 is our highest-end premium line with the most detailed custom enclosure work, highest level of finish, and the most aggressive visual presentation we offer.

Each product page lists exactly what is included. Our loaded plug & play packages can include the enclosure, subwoofers, amplifier, amp rack, wiring kit, integration harnesses, hardware, lighting, and install accessories depending on the package you choose.

Lead time depends on current workload and the level of package. Most standard builds ship within 6–12 weeks from the time your order is confirmed. Higher-end Signature stage 5 builds can take longer depending on customization and production schedule.

Our packages are designed to be as organized and install-friendly as possible. We also offer in-house installs at CB Customs in Weatherford, TX if you want everything professionally wired, mounted, and dialed in.

We stand behind our work with a lifetime craftsmanship warranty on our enclosures. If you ever have questions about fitment, setup, wiring, or tuning, you can reach out directly for support.

Yes. Most clients start with a 50% production deposit on our Plug & Play subwoofer kits and select custom products. Your deposit reserves your production slot and allows us to begin building your order. The remaining 50% balance isn't due until your system is complete and ready to ship or install, which is typically 6–12 weeks later.

You're not the first person to ask. 😄 Many of our customers choose the 50% deposit option because it spreads the cost over time. You'll pay half today to reserve your build slot, and the remaining balance isn't due until your system is finished and ready to ship. It makes budgeting a lot easier while still securing your place in our production schedule.

We accept major credit and debit cards, and financing options may be available at checkout on qualifying orders so you can get your system now and pay over time.